1-888-387-0911 Request a Consultation Contact Us

Optimize Floor Space

Share options :

  • Date : 10 / 09 / 2015
  • Author :
  • Comments : Comments Off on World leader in the key technology areas of heat transfer, separation and fluid handling looking to increase revenues by 40%
Situation: The world leader in the key technology areas of heat transfer, separation and fluid handling had set a goal to increase revenues by 40% in an overseas manufacturing plant. In order to achieve this business objective, it was critical to increase the coating capacity in the manufacturing process. Due to limited available floor space and the need to optimize material flow, adding capacity to the existing conventional fixed spray booth was not an option. As production ramped up to accommodate the . . .
Continue reading

Share options :

  • Date : 21 / 03 / 2014
  • Author :
  • Comments : 0
Situation: The North American facility of a market leader in ship power solutions manufactures propulsion systems for the U.S. Navy’s nuclear submarine program. Due to the size and complexity of the systems, production is limited to a maximum of two systems per year. Component finishing process involves both abrasive blasting and paint and coatings, and only takes up about six weeks of the entire production process. Air make-up is available and material handling is performed by overhead cranes. A fixed . . .
Continue reading